Face à la faiblesse persistante de la demande intérieure globale et à l'environnement complexe du marché international, la production et le volume des ventes de Hebei Huayang Steel Pipe Co., Ltd. ont dépassé 1 million de tonnes, jusqu'à 1 017 400 tonnes de janvier à août. Les ventes de Huayang en août ont atteint un record, avec des ventes mensuelles atteignant un nouveau record de 164 700 tonnes.
Hebei Huayang Steel Pipe Co., Ltd.’s fourth phase of automatic oil and gas transportation Longitudinal Submerged Arc Welding Pipe production line is in full swing. It is expected that the main equipment will be installed by the end of October, the whole line will be debugged by the end of November, and it will be officially put into production in December 2022. This LSAW pipe production line adopts the most advanced production equipment at home and abroad. The designed production capacity of this single production line is 120,000 tons. By 2023, Huayang will achieve a full production capacity of 1.6 million tons. After this LSAW pipe production line is put into operation, Hebei Huayang Steel Pipe Co., Ltd. will have three high-end LSAW pipe production lines, and its proportion in the oil and gas pipeline industry will be further expanded!